Integrated Assessment of Palm Oil Mill Residues to Sustainable Electricity System (POMR-SES): A Case Study from Peninsular Malaysia

Jaye, I, Sadhukhan, Jhuma and Murphy, Richard (2018) Integrated Assessment of Palm Oil Mill Residues to Sustainable Electricity System (POMR-SES): A Case Study from Peninsular Malaysia IOP Conference Series: Materials Science and Engineering, 358, 012002.

[img]
Preview
Text
Md_Jaye_2018_IOP_Conf._Ser.__Mater._Sci._Eng._358_012002.pdf - Version of Record
Available under License Creative Commons Attribution.

Download (709kB) | Preview

Abstract

Generating electricity from biomass are undeniably gives huge advantages to the energy security, environmental protection and the social development. Nevertheless, it always been negatively claimed as not economically competitive as compared to the conventional electricity generation system using fossil fuel. Due to the unfair subsidies given to renewable energy based fuel and the maturity of conventional electricity generation system, the commercialization of this system is rather discouraging. The uniqueness of the chemical and physical properties of the biomass and the functionality of the system are fully depending on the availability of the biomass resources, the capital expenditure of the system is relatively expensive. To remain competitive, biomass based system must be developed in their most economical form. Therefore the justification of the economies of scale of such system is become essential. This study will provide a comprehensive review of process to select an appropriate size for electricity generation plant from palm oil mill (POM) residues through the combustion of an empty fruit bunch (EFB) and biogas from the anaerobic digestion of palm oil mill effluent (POME) in Peninsular Malaysia using a mathematical model and simulation using ASPEN Plus software package. The system operated at 4 MW capacity is expected to provide a return on investment (ROI) of 20% with a payback period of 6.5 years. It is notably agreed that the correct selection of generation plant size will have a significant impact on overall economic and environmental feasibility of the system.

Item Type: Article
Divisions : Faculty of Engineering and Physical Sciences > Centre for Environmental Strategy
Authors :
NameEmailORCID
Jaye, I
Sadhukhan, JhumaJ.Sadhukhan@surrey.ac.uk
Murphy, Richardrj.murphy@surrey.ac.uk
Date : 2018
DOI : 10.1088/1757-899X/358/1/012002
Copyright Disclaimer : Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI. Published under licence by IOP Publishing Ltd
Depositing User : Melanie Hughes
Date Deposited : 29 May 2018 11:56
Last Modified : 16 Jan 2019 19:10
URI: http://epubs.surrey.ac.uk/id/eprint/846531

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year


Information about this web site

© The University of Surrey, Guildford, Surrey, GU2 7XH, United Kingdom.
+44 (0)1483 300800