University of Surrey

Test tubes in the lab Research in the ATI Dance Research

Bridge management using principles of whole life costing and life cycle assessment subject to uncertainty

Jin, NH, Chryssanthopoulos, MK and Parke, GAR (2005) Bridge management using principles of whole life costing and life cycle assessment subject to uncertainty Proceedings of the 5th International Conference on Bridge Management. pp. 426-432.

Full text not available from this repository.

Abstract

A new methodology for bridge management is proposed which encompasses whole life costing and life cycle assessment objectives under conditions of uncertainty. Stochastic multi-criteria decision analysis is used in order to calculate the most preferable maintenance scenario in terms of a linear combination of whole life cost and environmental score defined through the decision-maker's preference. The proposed methodology, which could be of use at project or network level, is demonstrated through a simple example of a reinforced concrete bridge element.

Item Type: Article
Authors :
NameEmailORCID
Jin, NHUNSPECIFIEDUNSPECIFIED
Chryssanthopoulos, MKUNSPECIFIEDUNSPECIFIED
Parke, GARg.parke@surrey.ac.ukUNSPECIFIED
Date : 1 December 2005
Depositing User : Symplectic Elements
Date Deposited : 17 May 2017 11:45
Last Modified : 17 May 2017 14:58
URI: http://epubs.surrey.ac.uk/id/eprint/832561

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year


Information about this web site

© The University of Surrey, Guildford, Surrey, GU2 7XH, United Kingdom.
+44 (0)1483 300800